ADU contractor in Long Beach
We are an ADU contractor in Long Beach, building in Bixby Knolls, Los Altos, Belmont Shore, Belmont Heights and North Long Beach. Book a free site visit by calling (310) 601-4416.

Go out and look at where your garage stands. Behind a Bixby Knolls house it may be a building of its own, and in Belmont Shore it may open onto an alley. Where it stands decides how the work reaches it and how far the new pipes and wiring have to go.
If you are in Los Altos or North Long Beach, tell us whether your garage is joined to the house or stands on its own, because that changes which build we look at first.
From the first drawing to the keys, permit included
- A free site visit. The visit takes about an hour on your lot, with no charge and nothing to sign.
- A written answer after the site visit. It says what fits on your lot, with an estimate for that scope.
- You pay for the build as each inspection passes. Every payment is in your contract before you sign.
- We draw it and we build it. We draw the plans, our engineer stamps them and we take them through the city. Then our crew builds the unit, and we book every inspection through the final.
- One year on the work. It runs from the date of the certificate of occupancy, and if something we built fails, we come back and fix it at no charge.
Look at these before we come out
The garage stands well back from the house
Pace it off from the back wall of the house to the garage door and tell us the number. That walk is close to the distance the new sewer, water and power lines have to cover.
On the site visit we measure it with a tape, and your estimate shows what that distance costs.
There is an alley behind the garage
Stand in the alley and look at what sits between it and your garage wall: a fence, a parking pad, a gate. If the house fills the front of the lot, the alley may be the only way in for the concrete truck.
We check the width of the alley and the turn into it. If the work can come in that way, a garage conversion leaves the front of your lot alone.
The yard behind the house is short
Look at how much ground sits between the back wall and the back fence. If your yard is short, a detached ADU may not have the room, and a garage conversion or an attached unit is what we would price instead.
We measure the yard on the visit and say in writing which of those your lot can take.
Stage 01 · Free site visit
About an hour on your lotWhat we do
We measure the yard and the garage and mark the setbacks, the distances the city keeps clear of each property line. We photograph the electric meter and the panel, find the sewer cleanout and check how a concrete truck would reach the back.
What you get
A written answer on what fits on your lot, with an estimate for that scope, within three working days.
When you pay
No charge for the visit or the estimate, and nothing to sign.
When the unit you want will not go on your lot
- The yard is too tight for anything new. A JADU, a junior ADU, is built inside the walls you already have, so it takes no yard at all. Our page on JADUs and attached ADUs explains the difference.
- You wanted a detached unit and there is not enough ground. The written answer names the build that does fit instead, with an estimate for it, and you decide from there. If that is the garage, our page on garage conversions shows what the work involves.
- If nothing will fit. We tell you in writing, and you owe nothing.

The builds we offer, and where each sits on your lot
- A garage conversion. We start with the garage you have, detached or attached, and run the new pipes and wiring from there to the house.
- A detached ADU. This is a new building in the yard on its own foundation, with its own sewer, water and power back to the house. It needs depth behind the house and a way in for the truck, and our page on detached ADUs has the ones we build.
- An attached ADU. It shares a wall with your house and is built out from the back of it, so the pipes and wiring stay short.
- A JADU. We make it inside the house you already have, with its own entrance. Our ADU plans page shows how the drawings start.
Which build suits your street in Long Beach
- A Craftsman or Spanish house in Bixby Knolls with a detached garage. The two builds to compare are converting the garage and building a detached unit in the yard. Either way, the distance back to the sewer is the cost to watch.
- A postwar tract house in Los Altos. If the garage is joined to the house, converting it or building an attached ADU keeps the new work close to the house. A detached unit comes down to the yard.
- A tight lot in Belmont Shore with the garage on the alley. If the alley is wide enough for the trucks, we look at converting the garage before anything else, and the work comes in from behind.

The price in Long Beach, and why it varies
Approximate prices, before we see your lot: a garage conversion about $100,000 to $180,000, a JADU, a junior ADU, about $90,000 to $160,000, an attached ADU about $180,000 to $320,000, and a detached ADU about $250,000 to $450,000.
- How far the unit sits from the house. The sewer, water and electrical lines all have to reach it, so a unit at the far end of a deep yard costs more to connect than one close to the house.
- How the truck gets in. On a tight Belmont Shore lot, whether a truck reaches the garage or the concrete has to be pumped in moves the estimate more than most things.
- The size of the garage you convert. The bigger it is, and the more of it you turn into living space, the more the conversion costs.
These come with the price:
- Sewer, water and electrical runs, to the lengths we measure on the visit
- Design drawings and structural engineering
- Debris hauling and cleanup
These are quoted separately:
- City fees, paid to the city
- A main panel upgrade, when your panel needs one
- A survey or soils report, when one is needed
The rest is under what is in the price.
Call (310) 601-4416 with the distance you paced off, or book a free site visit.
We also work nearby in Lakewood.
Other ADUs we build, from the plans to the keys
Start with an hour on your lot. The written answer and the estimate are yours to keep.
- About an hour on your lot
- No charge, nothing to sign
- We call back within one working day
- Written estimate within three working days
