ADU builder in Santa Clarita
ADU builder in Santa Clarita for Newhall, Canyon Country, Stevenson Ranch and Castaic, from garage conversions to detached units. Call (310) 601-4416 and tell us whether your garage is attached to the house.

If your house is one of the older, smaller ones in Newhall, walk out back and see whether the garage stands on its own. A detached garage with yard around it gives us two builds to measure, a conversion and a new unit, and the distance from each to the house goes into the price.
If you have a tract house with a two- or three-car garage joined on, the garage comes first, and how much of it you are ready to give up is your call.
From the first drawing to the keys, permit included
- A free site visit. The visit takes about an hour on your lot, with no charge and nothing to sign.
- A written answer after the site visit. It says what fits on your lot, with an estimate for that scope.
- You pay for the build as each inspection passes. Every payment is in your contract before you sign.
- We draw it and we build it. We draw the plans, our engineer stamps them and we take them through the city. Then our crew builds the unit, and we book every inspection through the final.
- One year on the work. It runs from the date of the certificate of occupancy, and if something we built fails, we come back and fix it at no charge.
What your garage and your yard are telling you
The garage is joined to the house and holds two or three cars
Look at whether the water heater or the washer sits in there, because either one takes up part of the floor. If you convert it, you lose the covered spaces inside the garage. The driveway usually stays, so you can still park on it.
We measure the garage on the site visit and tell you in writing how much of it becomes living space.
The ground behind the house climbs
In Canyon Country, Stevenson Ranch and Castaic, go to the back fence and see whether the ground behind the house is level or climbs. A detached unit on a slope needs a foundation that holds it there.
Tell us what you find, and the extra engineering a slope takes is priced in your estimate.
Stage 01 · Free site visit
About an hour on your lotWhat we do
We measure the yard and the garage and mark the setbacks, the distances the city keeps clear of each property line. We photograph the electric meter and the panel, find the sewer cleanout and check how a concrete truck would reach the back.
What you get
A written answer on what fits on your lot, with an estimate for that scope, within three working days.
When you pay
No charge for the visit or the estimate, and nothing to sign.
How the job goes, from our first walk around your lot to your keys
- We walk the lot with you and a tape, and you show us what you have in mind.
- Once the estimate is in your hands, you decide whether to go ahead, and with which build.
- You sit with us over the floor plan and the drawings of each outside wall, and you tell us what to change.
- Before we order, you pick the windows, fixtures, finishes and colors.
- If you want a change once the build is under way, you see its price in writing before the work is done.
- At the end, you walk the finished unit with your project lead and take the keys.
You pay in the stages set out in your contract, listed under the six stages, and when you pay.
The build to look at on each kind of Santa Clarita lot
- A tract house with an attached two- or three-car garage. If the garage is big enough, we look at converting part of it and leaving a space for the car. An attached ADU on the back of the house is the other build to price, and our garage conversions page goes through the first.
- An older small house in Newhall. If the garage is detached and the yard is deep, a new unit is worth pricing beside a conversion, and our page on detached ADUs shows the kind we build.
- A house in Stevenson Ranch or Castaic. Tell us whether the ground behind the house is level, because the slope decides whether a detached unit sits flat or on a stepped foundation. The builds that stay on the house are under JADUs and attached ADUs.

What a unit costs on a Santa Clarita lot
Approximate prices, before we see your lot: a garage conversion about $100,000 to $180,000, a JADU, a junior ADU, about $90,000 to $160,000, an attached ADU about $180,000 to $320,000, and a detached ADU about $250,000 to $450,000.
- How much of the garage you convert. The garage's size, and how much of it you turn into living space, both move the price of a conversion.
- How far a new unit sits from the house. A unit out in the yard needs longer sewer, water and power lines, and those cost more.
- What is under and around the unit. Ground that climbs behind the house, poor soil, or a large tree close to the footprint may mean a different foundation.
Your estimate covers:
- Booking every city inspection, through the final
- All construction, from the foundation to the paint
- Every round of plan-check corrections
Quoted separately:
- A main panel upgrade, when your panel needs one
- A survey or soils report, when one is needed
Our page on what is in the price sets it all out.
Call (310) 601-4416, or book a free site visit for a day you can walk the lot with us.
Other ADUs we build, from the plans to the keys
Start with an hour on your lot. The written answer and the estimate are yours to keep.
- About an hour on your lot
- No charge, nothing to sign
- We call back within one working day
- Written estimate within three working days
