ADU contractor in Culver City
We are an ADU contractor in Culver City, building in Carlson Park, McManus, Studio Village and up in Blair Hills. Call (310) 601-4416 to book a free site visit on your lot.

Pace off the ground behind your garage, from its back wall to the fence. If there is more yard than garage, a detached ADU may fit back there while the garage stays a garage, and if there is only a strip, the garage itself is what we measure first.
If your house is up in Blair Hills, the ground falls away somewhere on the lot, and the slope is what we look at before anything else, because the foundation has to follow it.
From the first drawing to the keys, permit included
- A free site visit. The visit takes about an hour on your lot, with no charge and nothing to sign.
- A written answer after the site visit. It says what fits on your lot, with an estimate for that scope.
- You pay for the build as each inspection passes. Every payment is in your contract before you sign.
- We draw it and we build it. We draw the plans, our engineer stamps them and we take them through the city. Then our crew builds the unit, and we book every inspection through the final.
- One year on the work. It runs from the date of the certificate of occupancy, and if something we built fails, we come back and fix it at no charge.
What your lot is telling you before we arrive
The driveway is too narrow for a truck
Stand at the street and look down the side of the house. If a car fits with a foot to spare on each side, a concrete truck does not, and the concrete has to reach the back by pump.
We measure the gap on the site visit and price the pump as part of the foundation. If your garage sits at the back of the lot, this is one of the first things we check.
The yard drops away behind the house
In Blair Hills, look at where the ground is level and where it falls. A detached unit wants the flat ground, and if there is none, the foundation has to step down the slope.
On the site visit we see how the ground falls, and a stepped foundation, with the extra engineering it takes, shows in your estimate with its own amount.
Stage 01 · Free site visit
About an hour on your lotWhat we do
We measure the yard and the garage and mark the setbacks, the distances the city keeps clear of each property line. We photograph the electric meter and the panel, find the sewer cleanout and check how a concrete truck would reach the back.
What you get
A written answer on what fits on your lot, with an estimate for that scope, within three working days.
When you pay
No charge for the visit or the estimate, and nothing to sign.
The builds to compare on a Culver City lot
- An older bungalow with a detached garage behind it. Turning the garage into living space keeps the yard open, and the sewer, water and electrical lines come back along the driveway to the house.
- A postwar ranch house. If your garage is joined to the house, an attached ADU built against the back, or a JADU, a junior ADU, made inside the house, keeps the pipes and wiring short. A detached unit needs yard behind the house, and we measure it on the visit.
- A hillside house in Blair Hills. The foundation has to follow the slope, and your estimate shows what that adds. If your garage stands on level ground, a conversion keeps the new rooms off the slope.

What we build, and where it begins on your lot
- Garage conversions. The garage you have becomes the unit, and the new pipes and wiring run from it to the house. Our page on garage conversions goes through what changes inside.
- Detached ADUs. A detached ADU is a new small house on its own foundation, in the yard behind yours. The depth of the yard and the way in for the truck decide whether it fits, and our page on detached ADUs shows the kind we build.
- Attached ADUs. An attached ADU is built against a wall of your house and shares its sewer and water, so it needs less yard than a detached unit. We set the two side by side under JADUs and attached ADUs.
- JADUs. A JADU is made inside the house you already have, with its own entrance. Our ADU plans page shows how a drawing begins for each of the four.
The price, from Blair Hills to the flats
Approximate prices, before we see your lot: a garage conversion about $100,000 to $180,000, a JADU, a junior ADU, about $90,000 to $160,000, an attached ADU about $180,000 to $320,000, and a detached ADU about $250,000 to $450,000.
- How the ground lies. A slope, poor soil or a large tree near the footprint can change the foundation, and a foundation that steps down a Blair Hills slope costs more than one on flat ground.
- How far the garage sits from the house. At the end of a long driveway, the trench for the sewer runs the whole way back, and any concrete we cut to get there is priced by what we measure.
- The size of the garage. How big the garage is, and how much of it you turn into living space, both change what a conversion costs.
Whatever the lot, your estimate includes:
- Every round of plan-check corrections
- Booking every city inspection, through the final
- One year on the work
Quoted separately:
- School district and other agency fees, where they apply
- A main panel upgrade, when your panel needs one
Our page on what is in the price has the full list.

Questions about your lot that come up before the visit
Not on the list? Ask it on the site visit, with your lot in front of us.
Book a free site visitWhat does my lender need from you?
Paying with a loan? We give your lender the plans, the contract and the payment schedule. While your loan is still being arranged, the estimate gives you a figure to take to them.
What if nothing fits on my lot?
We tell you in writing, and you owe nothing. If a garage conversion or a JADU would work where a detached unit will not, the answer says so.
What do I need ready for the site visit?
Nothing on paper. Know roughly when the house was built if you can, and which way the ground falls if you are in Blair Hills. We bring the tape.
When you are ready, book a free site visit, or call (310) 601-4416 with the length of your driveway handy.
We also work in Santa Monica.
Other ADUs we build, from the plans to the keys
Start with an hour on your lot. The written answer and the estimate are yours to keep.
- About an hour on your lot
- No charge, nothing to sign
- We call back within one working day
- Written estimate within three working days
